Installation Clearances - GE CV48S Manual Del Propietario E Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION CLEARANCES

These vent hoods are designed to be installed onto
a wall or beneath a soffit or cabinet.
the cooking surface.
NOTE: Clearances may vary due to type of
cooking product and local codes. Check with
local inspectors to be sure standard is applicable.
Soffit Installation
36" MAX.
In this installation the ductwork running from the top
of the hood will be concealed in the soffit or upper
cabinetry.
Wall Mount Installation
36" MAX.
For this installation, a decorative duct cover is
available to conceal the ductwork running from the
top of the hood. Use of the duct cover requires
special consideration to the installation height
above the countertop.
49-80819
Installation Preparation
SOFFIT
30" MIN.
30" MIN.
OPTIONAL DUCT COVER
ACCESSORIES
Standard decorative duct covers are available in
6" and 12" heights. Duct covers may be stacked,
in various combinations, to conceal the ductwork
running from the top of the hood to the ceiling.
installation height of the hood and order the
correct size duct cover. The duct covers should
be ordered at the same time as the vent hood
and be on site before installation. Order the duct
cover corresponding to your model.
Standard Duct Covers
6" Duct Covers
Hood
6" Duct
Model
Cover
CV48S
UX48DC6J
12" Duct Covers
Hood
12" Duct
Model
Cover
CV48S
UX48DC12J
OPTIONAL SERVICE PART
RANGE HOOD UTENSIL HOLDER
A utensil rack part # WB02X25909 is available as a
service part for this hood.
Visit GEApplianceParts.com for more details.
6" Duct Cover
12" Duct Cover
Dimensions
6"H x 19-11/16"W x 11-7/8"D
Dimensions
12"H x 19-11/16"W x 11-7/8"D
11

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido