Tools And Materials Required - GE CV48S Manual Del Propietario E Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

TOOLS AND MATERIALS
REQUIRED
(NOT SUPPLIED)
Pencil and tape
measure
Electric drill with 1/8" and 3/8" bits
Spirit level
Flashlight
Pliers
Wire Cutter/Stripper
Ladder
120V 60Hz. 15 or 20 Amp,
2-wire with ground. Properly
grounded branch circuit.
10
Installation Preparation
Phillips and Flat blade
Duct tape
screwdrivers
1/4" pivoting hex socket
Safety glasses
UL Listed Wire nuts
Hammer
Tin Snips
Saber saw or Key Hole Saw
10" round metal duct,
length to suit installation
Strain relief for
junction cover.
CAUTION
Lift the hood by grasping the
outside edges of the inlet opening of the hood. Do
not lift the hood by grasping the exhaust opening or
transition duct with damper!
packaging.
by reviewing the section named Parts Provided in
the Installation Instructions.
the back of the hood. Remove wood support.
Keep wood support and screws. These will be
used to mount the hood to the wall.
packing material has been removed from the
hood and transition duct with damper
Do not lift from
transition duct
Carton
Top view of open shipping carton
Hood
Lift hood out of carton
from the sides
49-80819

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido