Connect Ductwork; Install Duct Covers; Connect Electrical - GE CV48S Manual Del Propietario E Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3

CONNECT DUCTWORK

of airflow as illustrated.
seal.
Reach inside the hood and push the damper up
to be sure it moves freely.
Duct Tape
Over Seam
and Screw
Duct Tape
Over Transition
4

CONNECT ELECTRICAL

Verify that power is turned off at the source.
WARNING
If house wiring is not 2-wire with
a ground wire, a ground must be provided by the
installer. When house wiring is aluminum, be sure
to use U.L. approved anti-oxidant compound and
aluminum-to-copper connectors.
A.
B.
Remove
Insert Power
Junction Box
Conduit Thru
Cover
Strain Relief
and Tighten
Ground
C.
Use UL Listed
Wire Nuts
green, white to white and black to black.
Be sure wires are not pinched.
49-80819
Installation Instructions
Air Flow
Screw
White
Black
5

INSTALL DUCT COVERS

NOTE: For easier handling, remove cardboard
insert after film is peeled off.
Remove protective film from duct covers. If more
than one duct cover is used, secure each piece
together with screws provided.
to the top with the small Phillips head screws
supplied with the covers.
17

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido