INSTALLATION – RECIRCULATING
7
CONNECT ELECTRICAL
Verify that power is turned off at the source.
WARNING
If house wiring is not 2-wire with
a ground wire, a ground must be provided by the
installer. When house wiring is aluminum, be sure
to use U.L. approved antioxidant compound and
aluminum-to-copper connectors.
■ Remove the junction box cover and the selected
knockout.
Knockout
Junction
box cover
■ Secure the house wiring to the junction box with a
strain relief.
■ Connect the white lead to the branch circuit white
lead.
■ Connect the black lead to the branch circuit black
lead.
■ Connect the green/yellow lead to the branch circuit
green lead or bare ground lead.
■ Secure all the connections with wire nuts on each
electrical connector.
■ Push the wires into the junction box and replace the
cover. Be sure the wires are not pinched.
■ Secure the junction box cover with the 2 original
screws.
31-10724-7
Installation Instructions
8
INSTALL DUCT COVERS AND
UTENSIL RODS
■ Assemble the duct covers as shown.
Mounting screw holes
For this recirculating installation, the vent holes must
be positioned at the top. The vent holes must be
fully exposed to allow airflow into the room.
■ Insert the duct cover assembly into the impressions
on the top of the hood.
■ Extend the inner duct cover upwards to meet the
ceiling and support frame.
Install optional accessory ZX7510SPSS
(if needed to reach taller ceiling heights)
■ Separate the supplied duct cover. Discard the lower
(outer) section.
■ Slide the new ZX7510SPSS duct cover into the
original upper section. Be sure that the vent holes
are positioned toward the top.
■ Insert the duct cover assembly into the impressions
on the top of the hood.
■ Secure the duct cover at the top to the air deflector
with 2 screws provided.
■ Install the side utensil rods as shown with screws
provided.
17