Hilti DD-80 E Manual De Instrucciones página 13

Ocultar thumbs Ver también para DD-80 E:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 44
7.2a Fastening the vacuum baseplate (continued)
7.4 Mounting a rail on the baseplate
4
3
2
1
7.6 Fitting the stop on the rail
1
2
3
4
7.8 Extending the guide rail
2
4
3
5
1
Printed: 07.07.2013 | Doc-Nr: PUB / 5069607 / 000 / 00
1. After applying the vacuum, tighten
the levelling screws by hand, as far
as the will go, following a diagonal
sequence.
1. Connecting taper
2. Rail
3. Excentric pin
4. Wrench
1. Rail
2. Steel bar
3. Engaging teeth
4. Clamping screw
The use of a stop is mandatory for
overhead drilling and on walls.
1. Rail
2. Rail extension
3. Taper
4. Eccentric pins (2 pins)
5. Wrench
7.3 Bracing the baseplate using the quick-release column
3
4
2
1
7.5 Mounting the carriage on the rail
1
3
2
7.7 Adjusting the angle of the rail
2
4
3
1
7.9 Fitting the bracing spindle
5
6
4
1
2
3
1. Baseplate
2. Quick-release column
3. Telescopic column
4. Bracing mechanism
1. Carriage
2. Rail
3. Feed locking device
The feed locking device must face the
direction of drilling.
1. Baseplate
2. Baseplate taper for angular drilling
3. Clamping screw
4. Wrench
Secure the rail so that it cannot fall
before releasing the clamping screw.
Angular drilling in an upwards direc-
tion is not permitted (water collector
does not function correctly).
1. Rail
2. Eccentric pin
3. Wrench
4. Taper
5. Spindle
6. Locking nut
13

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido