Kohler Sterling 65010140 Guia De Instalacion página 3

Ocultar thumbs Ver también para Sterling 65010140:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1. Preparation
Install the water supplies and drain piping according to the
roughing-in information.
Determine which template cut line corresponds with the lavatory
model to be installed.
Cut out the template where indicated for countertop opening. Cut
along the inside of the cutting line.
Position the template on the countertop.
Verify cabinet clearance beneath the countertop.
Trace around the template on the countertop with a pencil.
Sterling
3
1032676-2-B

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Sterling 65020140Sterling 75010140Sterling 75020140

Tabla de contenido