Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 17
Installation
Batik™ box
Hole
Ø 65 mm.
50 mm min.
Screw-
fixing
RJ12
cable
492 77
492 78
Settings
After installation, each sensor should be set :
- make sure that all office furniture and light fittings
are in place.
- remove the front panel from the sensor.
- power up the circuit : the LED should light up.
IMPORTANT :
After each power-up, wait 30 seconds for the sensor
to become fully operational.
- set the time delay to the minimum setting.
NOTE : Set the sensor in daylight when the ambient light is at its highest level
and the lights are switched off.
- position the lighting level adjustment potentiometer at minimum
slowly to maximum until the light comes on.
- turn back slowly without switching off the light.
- select the required time delay.
- refit the front panel.
Ring fastener
Hole
Ø 76 mm.
Ø 65 mm
RJ12
Claw-fixing
cable
849 00/01
492 77 / 78
Not supplied
Fixing
holes
20

Time delay

adjustment
8
7
6
5
4
21
Wiring
Example
RJ12 double
connector
492 69
Ring faste-
ner
492 77/78
493 31/32
Important :
Do not connect more than two
detectors per unit input
Lighting
Setting the time delay
level adjust-
ment
Step
(493 32)
0
0
1
2
3
1
2
LED
3
4
5
6
7
( )
, then turn
8
Typical settings :
Offices, conference rooms and
Classrooms : 10 minutes
Warehouses and corridors :
5 minutes
Unit
493 02/04/12/14
RJ12
cable
Detector
Time delay
10 seconds
15 seconds
2 minutes
5 minutes
10 minutes
15 minutes
20 minutes
25 minutes
30 minutes

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Mosaic 493 32

Tabla de contenido