BADU JET Turbo Pro Traducción De Las Instrucciones Para El Manejo Originales página 79

Ocultar thumbs Ver también para JET Turbo Pro:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 262
Pool cut-out for stainless steel/foil pools
Fig. 10
Installation of the housing in a stainless steel or plastic pool
(b)
1.
Installation depth: The centre of the installation housing (1)
should be mounted 35 cm below the water level.
2.
Drill fastening holes and make cut-out in the pool wall
according to the drilling template.
NOTICE
For pools with a foil, it is recommended to reduce the rectangular
cut-out all round to increase the distance from the holes. The
overhanging foil can be stuck to the inside of the housing.
3.
Clamp support slats (17) between the two overlaps of the
inside of the housing.
4.
Press in the foam rubber seal (11) without tension along the
groove on the housing (1) by hand. Fix with a drop of instant
glue on the floor side.
5.
Align the installation housing (1) according to the label
"OBEN/UP/ HAUT" to the drilled holes in the outer wall.
6.
Screw the plastic panel (5) to the housing (1) on the pool wall
from the inside of the pool with 36 tapping screws (51) with a
torque of 6 Nm.
08|2020
Installation
EN 25

Publicidad

Tabla de contenido
loading

Tabla de contenido