Kohler Vanity Guía De Instalación Y Cuidado página 6

Ocultar thumbs Ver también para Vanity:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3. Preparation
CAUTION: Risk of property damage. To properly support
the weight of the vanity and sink, secure to stud framing or
2x6 bracing behind the finished wall.
If installing 2x6 bracing, front-notch the studs 1-1/2" (38 mm) to
ensure the bracing sits flush against the studs. The bracing
should span the length of the vanity.
Plan for routing supply and drain piping for your desired sink
installation.
Plan for electrical service if installing the optional electrical strip.
Any electrical accessory components must be connected to a
circuit protected by a Ground-Fault Circuit-Interrupter (GFCI) or
Residual Current Device (RCD).
NOTICE: To ensure proper support and alignment: The finished
wall must be straight and plumb. The floor must be flat and
perpendicular to the finished wall.
Complete the finished wall.
1216526-2-F
2x6
Bracing
34-1/2"
(876 mm)
Products May Vary
in Appearance
6
Plan the plumbing
area for the sink.
Kohler Co.

Publicidad

Tabla de contenido
loading

Tabla de contenido