Electrical Installation - GOK SmartBox 1 Instrucciones Para El Montaje Y El Funcionamiento

Ocultar thumbs Ver también para SmartBox 1:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 81
Installation of the display unit
2.
Mount the display unit to the wall in a suitable position.
6. Open the display unit by removing the bottom cover.
7. After loosening the 2 screws, open the display unit by removing the cover.
8. Mount the display unit to a smooth vertical wall by means of dowels. Mount the housing
of the display unit by the four fixing holes with the enclosed screws and anchors.
Take care not to damage the housing.
9. After connecting the terminals and setting the unit up, replace the covers.

ELECTRICAL INSTALLATION

Connection line between display unit and level probe
Voltage
Connection
SmartBox
mechanisms or misuse it!
Injuries and damage to health and property through misuse.
You must observe the information contained in these instructions, especially
regarding installation, start-up and maintenance.
Can result in short circuit or electric shock.
Do not use the device if the insulation is damaged!
Have new insulation installed by a specialised company!
Artikel-Nr. 28 100 51 h
1.
Probe supply 20 V DC
Level probe connection cable
Level probe
- terminals
Do not use this device for safety applications or emergency stop
Damaged or destroyed insulation!
®
SmartBox
1 / SmartBox
Connection of supply voltage:
Voltage:
Connection:
+
1
®
2 / SmartBox
230 V AC 50 Hz
Terminals N + L to the
display unit (cable not
included in the delivery)
2
 Tank 1
®
3
21 / 112

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Smartbox 2Smartbox 3

Tabla de contenido