6556083.book Seite 18 Montag, 18. April 2016 4:35 16
4 Preparation
18
4
Preparation
4.1
Initial start-up and longer breaks in use
✔ The turbine is only able to reach full power if indicated operating
Turbine
pressures are set [ → 14]. If necessary have the pressures checked
by a service engineer with a star tester that is placed between the
supply hose and the quick coupling.
➢ Sterilize the turbine and accessory parts prior to startup.
➢ Clean and maintain the turbine after longer breaks in use.
4.2
Prior to starting the work day
➢ Purge the water and air channels for 30 seconds.
Operating Instructions BA ULTIMATE
65 56 083 D3560.201.10.02.02