Operating The Volcano Hybrid; Installation; Heating Up - STORZ & BICKEL HYBRID Volcano Modo De Empleo

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 154
7. O P E R AT I N G T H E V O L C A N O H Y B R I D

7.1. Installation

Do not leave the device unat-
tended during operation. Put
the VOLCANO HYBRID on a
flat and stable surface. Check whether
the mains voltage corresponds to the
voltage rating stated on the device.
The Power Cord and the power plug
must be in perfect condition. Only con-
nect the VOLCANO HYBRID to a prop-
erly installed socket.
When the power plug is plugged in,
all sequences of the LCD display light
up briefly, after which the firmware
number is displayed. The mains sup-
ply indicator, which then appears on
the display, indicates that the Hot Air
Generator is connected to the mains
supply.

7.2. Heating Up

To turn on the heater, press the touch
button 'HEAT'. The set/actual tem-
perature will light up, signaling that
the heater is switched on. The upper,
orange display shows the actual tem-
perature in the Filling Chamber, the
lower, white display shows the desired
set temperature. The heating process
is completed when the set value is
equal to the actual value. This is also in-
dicated acoustically by briefly switch-
ing on the pump (can be switched off
using the app). Depending on the set
temperature, heating-up can take up
to two minutes. After the heating pro-
cess is completed, the temperature is
constantly maintained at the set value.
For technical reasons the
temperature in the Filling
Chamber cannot be mea-
sured during vaporization. During op-
eration the temperature is measured
at the heat exchanger. The display in-
dicates the reference values for the
attached Filling Chamber with the
pump switched on.
75

Publicidad

Tabla de contenido
loading

Tabla de contenido