System Setup - Uline H-4008 Manual Del Usuario

Máquina para rollo de burbuja instantánea
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1.
Uncrate the machine.
2. The installation area should have a sufficient amount
of clear, dry and level space for your packaging
application, operation and service of machine.
3. Verify that the required electrical power receptacle
is installed at the desired machine location.
4. Load the material roll.
LOADING THE MATERIAL ROLL
1.
Load the material roll onto the material mandrel.
(See Figure 1)
• Hold the new material roll so that the open end is
facing towards the control panel.
• Slide the roll fully onto the mandrel so that the end
of the core is contacting the collar.
2. Feed the material into the system. (See Figure 2)
• Lower the clamp handle to open the edge seal
assembly.
Figure 2
Inflation
Nozzle
Clamp Handle
PAGE 3 OF 30
Figure 1
Material
"Flapper"
Edge Seal
Assembly
(Open)

SYSTEM SETUP

• Thread the material over the blue directional roller
and under the black bar.
• Spread the open end of the material and wrap
around the inflation nozzle (bent metal tube) and
the material "flapper."
• Thread between the two wheels on the edge seal
assembly.
3. Close the clamp and make a few feet of inflated
cushioning material. (See Figure 3)
• While maintaining tension on the material, raise the
clamp handle to close the edge seal assembly.
NOTE: If the material is not inflating and/or
sealing after 8" (20cm), re-feed the material.
(Step 2)
Mandrel
Figure 3
Start Key
Clamp Handle
(Closed)
0521 IH-4008

Publicidad

Tabla de contenido
loading

Tabla de contenido