3. Installation and Wiring
4. Working from the bottom up, install 10 batteries on the first and second shelves on the right side of the unit (Figure 3-9).
Always keep the terminal side of all batteries facing up.
5. Install 10 batteries on the third and fourth shelves on the right side (Figure 3-10). Always keep the terminal side of all
batteries facing up.
Figure 3-9: Install batteries on the first and second shelves on the right side.
Figure 3-10: Install batteries on the third and fourth shelves on the right side.
20