7. A list of the identified inverters of the selected Inverter
Manager is displayed.
Make sure that all inverters are present. It is possible to
continue the configuration of the listed inverters even if not
all inverters are detected. The undetected inverters can
always be configured later.
8. Select the desired country from the list of options
available for the inverters in the network (see figure
13).
9. Select the desired grid code from the list of options
available for the selected country. If necessary, load a
customer specific grid code by clicking the button
[Load] (see figure 13). The button [Create] is inactive
and cannot be used.