Location requirements
General:
All of the location requirements for the charging station in the "KeContact P20(-U)
Installation manual" must be adhered to!
When mounting the floor-mounted columns in parking spaces or parking garages, appro-
priate anti-collision protection must be provided by the customer.
Concrete foundation:
The calculation, design and manufacture of the concrete founcation lies in the scope of
responsibility of the producer of the site.
A horizontal, level and sound foundation is required for installation.
To ensure safe and permanent anchoring, we recommend creating a concrete founda-
tion:
65cm (L) x 50cm (W), depth = min. frost limit but > 40cm, frost-free.
Concrete: C30/37 LP for XC4, XD1, XF4 or C25/30 LP for XC4, XD1, XF2
reinforced concrete: BSt 500 S; BSt 500 M
The base must permit the running off of any water that has entered the base.
All cables must be laid precisely in the centre of the concrete foundation from the base
and must have an excess length of approx. 1.5 m for the remaining installation activities.
During the production of the concrete foundation, the cables must be protected against
damage using appropriate measures (e.g., a protective tube). The protective tube must
have an excess length of approx. 25 cm above the concrete foundation.
Mounting the column on asphalt is not allowed!
Anchoring to the base
The enclosed dowels must be used for anchoring (6 x Hilti HKD-ER compact dowels
M10x40).
Specifications for compact dowels Hilti HKD-ER M10x40. Source: Hilti
12
Technical data
Anchorage ground
Recommended load
Per dowel
Required clearance
Torque Tinst
Drill-hole diameter do
Drill-hole depth h1
KeContact P20 - Floor-mounted column ML, v2.00, #90333
Standard concrete with a strength
class of B300 or greater
Tension N (uncracked concrete)
Transversal shear V (uncracked con-
crete)
M10
5
4.4 kN
14 cm
20 Nm
12 mm
43 mm
© KEBA 2012