6556067_EN.book Seite 39 Montag, 18. April 2016 2:41 14
Operating Instructions BA ULTIMATE
134°C
274°F
65 56 067 D3560.201.09.02.02
7.5
Sterilizing
✔ The turbine is cleaned and disinfected.
Steps _ Turbine
✔ Turbine maintenance is complete.
✔ If necessary, the turbine can be sterilized in packaging suitable for
sterilization and storage, e.g. paper/plastic composite packaging or
container.
➢ Sterilize the turbine in the steam sterilizer with saturated water
vapor.
Unit pressure in bar and psi ww
Overpressure:
2.04 bar (29.59 psi)
Temperature:
134° C (274° F)
Holding time:
3 min
7 Conditioning
39