Connections; First Switch On - ABB D1 Manual De Instrucciones

Ocultar thumbs Ver también para D1:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 47
Function
Permanent manual forcing of channel 1
and 2 (ref. subsection 3-7).
Press for 2 secs. to access PERM and
alternate pressure to change it from
PERM ON to PERM OFF.
Return to AUTO mode (if any manual
forcing has been activated).
i
It is necessary to be on the initial screen to carry out any of the above-
EN
mentioned functions

1-6 Connections

i
Maximum distance for external input: 100 m.
Connection of single channel and twin channel models
Ref. Fig. 5-1 to Fig.5-3.
Connection of Synchro models
Single channel or twin channel Synchro models with GPS or DCF77 Antenna.
Ref. Fig. 6-1 to Fig.6-2.

1-7 First switch ON

The equipment is supplied without any settings.
RESET with a pointed object to unlock the equipment (ref. Fig.4).
1.
Press
2.
Set following data:
LaNguagES
DaTE/TiME
i
If there is a power failure, the Date/Time is memorised, and the digital switch:
disables relay(s),
deactivates back-lighting, if active,
6
(ref. subsection 3-8-1).
(Year, Month, Day, Time, Time Zone (ref. subsection 3-8-2)).
Combined keys
+
+
2 secs.
+
2 secs.
+
+
2 secs.
+
2 secs.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

D1 plusD1 synchroD2D2 plusD2 synchro2csm258763r0621 ... Mostrar todo

Tabla de contenido