Project Source F11A4503OB Manual De Instrucciones página 8

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY INSTRUCTIONS
4.
The plaster guard (G) is adjustable to
accommodate the installation needs.
5a. For pipe 4: Use 1/2 in. copper or IPS pipe only.
If soldering connections, cartridge and integral
stops must be removed to avoid heat damage.
Reinstall when connections are completed and
valve has cooled.
5b. Note: Includes a valve plug (J) so fixture can
be used in Shower Only applications.
4
4
OPTION
5a
5a
1
5b
5b
1
8
5-1/2"
(140 mm)
5-1/8 in.
(130.3 mm)
3-1/16 in.
(77.5 mm)
3
2
4
3
2
J
G

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido