Installation Instructions; Installation-Vented To The Outside; Ductwork, Wiring Locations; Install Framing For Hood Support - Monogram ZV830 Instrucciones De Instalación

Ocultar thumbs Ver también para ZV830:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION—VENTED TO THE OUTSIDE

DUCTWORK, WIRING LOCATIONS

Use a level to draw a straight pencil line on the wall.
Location
1-1/4"
TOP
MOUNTING
NOTE: Top
HOLE
mounting
screws MUST
DRILL 1/8"
engage wood
PILOT HOLE
support.
9-7/16"
15-7/16"
Min.
BOTTOM
MOUNTING
HOLE
Installation Height
Align Bottom Edge With
Pencil Line Indicating
Bottom of Hood
Tape the template in position along the penciled line.
Ceiling ducting:
centerline on the template to the ceiling.
of an 8-1/2" hole on the ceiling.
NOTE:
to the 5-1/2" dimension.
Wall Ducting:
centerline on the template.
centerline of an 8-1/2" dia. duct hole. (Hole may be
elongated for duct elbow.)
HOUSE WIRING LOCATION:
the hood.
side of the centerline.
49-80512 Rev. 4

Installation Instructions

Ceiling
C
min. above
L
installation
1-1/4"
10-1/16"
TOP
MOUNTING
NOTE: Top
HOLE
mounting
screws MUST
DRILL 1/8"
engage wood
PILOT HOLE
support.
REAR WALL
MOUNTING TEMPLATE
15-7/16"
9-7/16"
C L
BOTTOM
MOUNTING
HOLE
Installation Height
Align Bottom Edge With
Pencil Line Indicating
Bottom of Hood
1
INSTALL FRAMING FOR HOOD
SUPPORT
IMPORTANT:
height
the top mounting brackets. Remove the template.
at the bracket location indicated on the template.
two wall studs at the mounting screw location. The
horizontal support must be flush with the room
side of the studs. Use cleats behind both sides of
the support to secure to wall studs.
IMPORTANT: Reinstall drywall for an even mounting
surface.
View from rear
mounting support
Centerline of
installation
space
cleats

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Zv830sm1ssMoreradwrh2051Zv830sm2ss

Tabla de contenido