GE Druck DPI612 Guia De Inicio Rapido página 14

Ocultar thumbs Ver también para Druck DPI612:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 81
Safety and Quick Start Guide
7.1.3 Pressure operation
Step
Procedure (Pressure)
1.
Set to pressure operation (+) (Ref: Item 3.1).
Turn the volume adjuster to mid-range (Ref: Item 2).
2.
3.
Seal the system (Ref: Item 5).
4.
Set the approximate pressure with the pump (Ref: Item 3).
5.
Adjust the pressure with the volume adjuster (Ref: Item 2).
6.
On completion of test, open the pressure release valve one turn (Ref: Item 5) to
release pressure before disconnection of device under test.
7.2
DPI612 – PFP (100 Bar)
PRESSURIZED GASES AND FLUIDS ARE DANGEROUS. BEFORE CONNECTING
OR DISCONNECTING PRESSURE EQUIPMENT, SAFELY RELEASE ALL THE
PRESSURE.
To prevent damage to the pressure station, do not let dirt get into the
pressure mechanism. Before connecting equipment, make sure it is clean
or use the applicable dirt trap.
7.2.1 Release the pressure/Attach the device under test
Step
Procedure
1.
Fully open the refill valve (Ref: Item 5.1)
2.
Open the pressure release valve (one turn) (Ref: Item 5)
3.
Use the applicable adaptor to attach the device, (Ref: Figure 8)
Page 14 of 20
Druck DPI612
[EN] English – 109M0089

Publicidad

Tabla de contenido
loading

Tabla de contenido