INSTALLATION GAS TRAIN MC
DUAL 4 P / 5 P MC
1. Tubazione gas
2. Rubinetto di intercettazione
3. Giunto antivibrante
4. Presa di pressione
ADJUSTMENT GAS GOVERNOR
The gas governor, with built-in filter, must be installed so as to stabilise the outlet gas pressure
and to avoid that eventual impurities reach the gas valve. To increase gas pressure, remove the
cover of governor and turn screw C. Unscrew screw C to reduce pressure, then fit the cover.
Note: the inlet gas pressure must not be higher than the specified max. gas pressure.
CONNECTION TO THE GAS PIPELINE
Once connected the burner to the gas pipeline, it is necessary to control that this last is perfectly sealed. Also verify that
the chimney is not obstructed. Open the gas cock and carefully bleed the piping through the pressure gauge connector,
then check the pressure value trough a suitable gauge. Power on the system and adjust the thermostats to the desired
temperature. When thermostats close, the sealing control device runs a seal test of valves; at the end of the test the bur-
ner will be enabled to run the start-up sequence.
All burners are factory tested and set at 230 V 50 Hz .
Same recommendations of the oil start. Then put the switch on gas position, give power and close the thermostat con-
sent. The ignition and preventilation phase goes on the same way than oil start. Once the ignition is made regulate the
flow rate by the adjustment of the working valve and set the combustion with the same head and air regulations of the
oil burner start. Inserting a screwdriver on the seat over the valve does the regulation of maximum flow rate: the
clockwise rotation decreases it, the anticlockwise one increases it.
IMPORTANT: to obtain the right adjustment of the combustion and thermal capacity it is important to analyze the
reducts of combustion with the aid of suitable instruments. The combustion and thermal capacity adjustment is done
simultaneously, together with the analysis of the products of combustion, making sure that the measured values are sui-
table and that they comply with current safety standards. On this matter, please refer to the table and figure below.
THESE OPERATIONS MUST BE DONE BY PROFESSIONALLY-QUALIFIED TECHNICIANS.
Natural Gas
CO
9,6%
2
CO
<50 ppm
L.P.G.
CO
11,7%
2
CO
<50 ppm
5. Gruppo Multiblock versione
On-Off completo di:
- filtro gas
- regolatore di pressione
- valvola di sicurezza
- valvola di 1° stadio

ELECTRICAL CONNECTIONS

START OF GAS BURNER
ADJUSTING THE COMBUSTION PROCESS
SUGGESTED REFERENCE VALUES
1,3
30
1,25
25
20
1,2
15
1,15
10
1,1
10
20
30
420010347701 Dual 1-2-3-4-5 P / MC
installatore
1
2
1,2
40 50 60
80
100
200
70
90
RATED USEFUL CAPACITY (KW)
15
4
4
3
+
1,2
300 400
600
800
1000
2000
500
700
900
EN
5
4
C

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Dual 2Dual 3Dual 3 pDual 4Dual 4 pDual 4 p mc ... Mostrar todo

Tabla de contenido