Ecoflam DUAL 1 Manual De Instrucciones página 16

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 32
420010347701 Dual 1-2-3-4-5 P / MC
EN
The Siemens control box starts the fan and begins the pre-purging of the combustion chamber. The air pressure switch controls the
correct operation. At the end of the pre-purging phase, the ignition transformer cuts-in followed by the opening of the gas valves.
In case of missed ignition or accidental shutdown, the ionisation probe cuts-in and set the burner in lockout mode within the safety
time.
Gas pressure swi ch
Air pressure swi ch
Transformer
High flame ON/OFF
Flame de ec ion
Lock ou
The ignition flow rate is carefully adjusted. during test phase to 1/3 of the maximum flow rate (according to specifications).
Operations for eventual further adjustment must be carried out by skilled personnel authorized by ECOFLAM
BRAHMA EG 12 L
T
+
C
2
Q
1
7
CONTROL BOXES SIEMENS LGB 21/22
2
Mo or
1
Gas valve
lamp
ADJUSTMENT OF GAS SOLENOID VALVES
To adjust gas output, loosed
the screw B and turn the
knob C as required. To
reduce output, turn knob
H
clockwise, to increase it
B
turn knob counter-clockwi-
se. Tighten the screw B. For
+
fast opening adjustment,
remove the cap T and insert
the spanner on the pin H
turning on the requested
direction. To reduce firing
output screw it up, to
increase, unscrew it.
T
MULTIBLOC
MB-DLE
P
3
11
R
10
9
6 5
8
3
4
Description
1
pressure swi ch con rol ime-ou
2
ime-ou for air pressure confirma ion
5
3
prewashing ime
4
safe y ime
6
5
preigni ion ime
6
ime-ou
1 Pressure governor adjustment
2 Fast opening hydraulic brake's adjustment
3 Low flame flow rate adjustment
4 High flame flow rate adjustment
5 Inlet pressure port
6 Pressure governor membrane's bleed
7 Minimum presure switch adjustment
(VPS 504)
8 Pressure port after gas filter
9 Pressure port after pressure governor. During leakage
control test, is used to measure test pressure (~150 mbar).
When burner is running, it is used to measure governor's
outlet pressure.
10 Working lamp (yellow)
11 Leakage control device rearm button (red)
16
o enable fuel 2nd valve
BRAHMA EG 12 SR
Max output adjustment is to be
made by inserting and elbow span-
ner in the socket S situated at the
bottom of the valve and turning to
the left to increase output, to the
right to reduce it.
9"
3"
30"
3"
3"
8"

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Dual 2Dual 3Dual 3 pDual 4Dual 4 pDual 4 p mc ... Mostrar todo

Tabla de contenido