420010347701 Dual 1-2-3-4-5 P / MC
EN
The Siemens control box starts the fan and begins the pre-purging of the combustion chamber. The air pressure switch controls the
correct operation. At the end of the pre-purging phase, the ignition transformer cuts-in followed by the opening of the gas valves.
In case of missed ignition or accidental shutdown, the ionisation probe cuts-in and set the burner in lockout mode within the safety
time.
Gas pressure swi ch
Air pressure swi ch
Transformer
High flame ON/OFF
Flame de ec ion
Lock ou
The ignition flow rate is carefully adjusted. during test phase to 1/3 of the maximum flow rate (according to specifications).
Operations for eventual further adjustment must be carried out by skilled personnel authorized by ECOFLAM
BRAHMA EG 12 L
T
+
–
C
–
2
Q
1
7
CONTROL BOXES SIEMENS LGB 21/22
2
Mo or
1
Gas valve
lamp
ADJUSTMENT OF GAS SOLENOID VALVES
To adjust gas output, loosed
the screw B and turn the
knob C as required. To
reduce output, turn knob
H
clockwise, to increase it
B
turn knob counter-clockwi-
se. Tighten the screw B. For
+
fast opening adjustment,
remove the cap T and insert
the spanner on the pin H
turning on the requested
direction. To reduce firing
output screw it up, to
increase, unscrew it.
T
MULTIBLOC
MB-DLE
P
3
11
R
10
9
6 5
8
3
4
Description
1
pressure swi ch con rol ime-ou
2
ime-ou for air pressure confirma ion
5
3
prewashing ime
4
safe y ime
6
5
preigni ion ime
6
ime-ou
1 Pressure governor adjustment
2 Fast opening hydraulic brake's adjustment
3 Low flame flow rate adjustment
4 High flame flow rate adjustment
5 Inlet pressure port
6 Pressure governor membrane's bleed
7 Minimum presure switch adjustment
(VPS 504)
8 Pressure port after gas filter
9 Pressure port after pressure governor. During leakage
control test, is used to measure test pressure (~150 mbar).
When burner is running, it is used to measure governor's
outlet pressure.
10 Working lamp (yellow)
11 Leakage control device rearm button (red)
16
o enable fuel 2nd valve
BRAHMA EG 12 SR
Max output adjustment is to be
made by inserting and elbow span-
ner in the socket S situated at the
bottom of the valve and turning to
the left to increase output, to the
right to reduce it.
9"
3"
30"
3"
3"
8"