REYNAERS CP 50 Manual Del Usuario página 43

Ventanas y balconeras correderas
Tabla de contenido

Publicidad

CP 50
II.1.2
Assembly
We make the following subdivision:
1. Corner connections;
2. T-brackets;
3. Drainage, aeration and recesses for the accessories;
4. Gaskets.
1.2.1 Corner connections
Steps:
a. Correct sawing, punching or drilling.
b. Protection of the saw cuts by:
- deburring (if necessary);
- removing dust and saw-dust on the saw cut and in the profile chamber;
- degreasing (Degreaser art.nr. 086.9181.--);
- applying anti-corrosion product (Anticorro art.nr. 086.9609.--); drying time: about 1 hour.
c. Sealing: applying a neutral elastic sealing agent on the saw cuts.
d. Glueing: applying an approved sealing glue (glue for corner connection Körapur art.nr. 084.9069.--).
- Apply sealing glue in the profile chamber.
- Also glue the rebate support.
e. Making the connection:
- Outer frame : the corner cleats can be inserted and the mechanical corner connection can be made,
either by crimping or by screwing.
- Sliding panel : the sliding panels are cut straight and the corner connection is made by means of a
screw.
f. The adhesive residue on the visible sides of the completed elements has to be removed by means
of a non-aggressive product (Reynaclean art.nr. 086.9201.--).
1.2.2 T-brackets
Steps:
a. Correct sawing, milling, punching or drilling.
b. Protection of the saw cuts by:
- deburring (if necessary);
- removing dust and saw-dust on the saw cut and in the profile chamber;
- degreasing (Degreaser art.nr. 086.9181.--);
- applying anti-corrosion product (Anticorro art.nr. 086.9609.--); drying time: about 1 hour.
c. Sealing: applying a neutral sealing agent:
- on the saw cuts;
- on the fixing holes.
Remark : The area under the transom/mullions may not be completely watertight in order to obtain a
controlled drainage of the sliding panel (see page 37.f.040-049).
d. Making the connection: the transom/mullion is inserted and screwed.
e. The sealing agent residue on the visible sides of the completed elements has to be removed by
means of a non-aggressive product (Reynaclean art.nr. 086.9201.--).
1.2.3 Drainage, aeration and recesses for the accessories
Steps:
a. Correct punching, drilling or milling.
b. Protection of the treated surfaces by:
- deburring (if necessary);
- removing dust and saw-dust ;
- degreasing (Degreaser art.nr. 086.9181.--) ;
- applying anti-corrosion product (Anticorro art.nr. 086.9609.--); drying time: about 1 hour.
Special attention should be paid to the following regarding drainage / aeration:
- All types of sliding elements should be provided with a drainage system in the bottom profiles or the
transoms. This is to allow infiltrating water to escape outside and also ensures that the profile's
chambers remain at atmospheric pressure.
- For all sliding elements, drainage holes should be a maximum of 250 mm from the corner for the
sliding panel and 100 mm for the outer frame. The maximum distance between 2 drainage holes is
800 mm.
- The minimum surface of these openings is 50 mm² per opening in the sliding panel, either a round
03/2003
Información general sistema
Généralités séries
General information systems
Allgemeine Information Systeme
PRESCRIPCIONES DE TRATAMIENTO
RECOMMANDATIONS DE TRAITEMENT
PROCESSING DATA
VERARBEITUNGSVORSCHRIFTEN
37.B.057

Publicidad

Tabla de contenido
loading

Tabla de contenido