Prep A Ra Tion For Stor Age; Re Turn To Ser Vice; Stor Age - Ammann ARW 65 Traducción Del Instrucciones De Servicio Original

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

9.1 Stor age

9.1.1 Prep a ra tion for stor age

If the ma chine is to be shut down for an ex tended time (lon ger
than 6 weeks), it should be placed stably on a pal let on a firm,
even sur face.
• The stor age area should be dry and pro tected.
• The am bi ent tem per a ture should be be tween 0°C / 32°F and
45°C / 113°F.
• Be fore stor ing the ma chine
• clean it thor oughly
• check for leaks and dam age, and fix any prob lems.
• cover it with a pro tec tive tar pau lin.

9.1.2 Re turn to ser vice

• Be fore us ing the ma chine again, check for
• leaks,
• de fec tive or leaky hy drau lic hoses, and
• any other dam age.
• Re pair any prob lems found.
• Check all screw joints and tighten them.
82
9. Stor age

Publicidad

Tabla de contenido
loading

Tabla de contenido