Ce Marking; Installation; Checking The Scope Of Delivery; Checking The Requirements For The Installation Site - Vaillant allSTOR plus VPS 800/4-5 Instrucciones De Instalación Y Mantenimiento

Ocultar thumbs Ver también para allSTOR plus VPS 800/4-5:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 31
3.5

CE marking

The CE marking shows that the products comply with the
basic requirements of the applicable directives as stated on
the declaration of conformity.
The declaration of conformity can be viewed at the manufac-
turer's site.
4

Installation

4.1

Checking the scope of delivery

Check that the scope of delivery is complete.
Quantity
Name
1
Buffer cylinder
1
Purging valve
1
Upper heat insulation
1
Lower heat insulation (footpad)
2 (3)
Side heat insulation, VPS 800/1000 (VPS
1500/2000)
2 (3)
Cover strips, VPS 800/1000 (VPS 1500/2000)
1
Cover
4
Thermal insulation caps
10
Collars
1
Data plate sticker
1
Operating instructions
1
Installation and maintenance instructions
4.2
Checking the requirements for the
installation site
Caution.
Material damage due to leaking heating
water
In the event of damage, all of the heating wa-
ter from the heating installation may escape
from the product.
Install the product close to a floor drain.
Caution.
Material damage due to high load
Due to its weight, the filled buffer cylinder
may damage the floor.
Ensure that the base is level and is suit-
able for bearing the entire weight of the
product.
1.
Select the installation site so that the cables can be
easily routed.
2.
Select an installation site that is as close as possible to
the heat generator.
0020314387_00 allSTOR plus Installation and maintenance instructions
4.2.1
Observing the minimum clearances
Observe the required minimum clearances between the
product and the walls and ceiling.
Type
To the
designation
sides
VPS 800/4-5
500
VPS 1000/4-5
500
VPS 1500/4-5
600
VPS 2000/4-5
650
4.2.2
Observing the tilt dimension
A
A
Tilt dimension
Observe the product's tilt dimension.
Type designation
VPS 800/4-5
VPS 1000/4-5
VPS 1500/4-5
VPS 2000/4-5
4.3

Transporting the product

Caution.
Damage to the thread
Unprotected threads may be damaged during
transport.
Only remove the threaded protective caps
once at the installation site.
Clearance [mm]
To the rear
Upwards
300
350
Tilt dimension A
[mm]
1890
2263
2273
2414
21

Publicidad

Tabla de contenido
loading

Tabla de contenido