Kohler K-6504 Guia De Instalacion página 14

Ocultar thumbs Ver también para K-6504:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Install the Transfer Valve (cont.)
For cast iron baths: Thread the collar partially onto the brass
body with the flange down.
For all other baths: Thread the collar partially onto the brass
body with the flange up.
Hand tighten the plated nut onto the brass body.
Reinstall the plaster guard.
Position the collar to create a gap 1/8" (3 mm) to 9/16" (1.4 cm)
between the finished deck and the bottom of the plaster guard.
Securely tighten the mounting nut until it is flush against the
finished deck.
Dry fit all the piping and connectors.
Solder the remaining piping and connectors.
113762-2-CD
14
Kohler Co.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-6504-2

Tabla de contenido