Acceptance Check; Handling And Lifting; Installation Foundation - Gree D Serie Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

D Series Modular Air-cooled Scroll Chillers Owner's Manual

4.2 Acceptance Check

The user is responsible for organizing personnel to perform the acceptance check at the
regulated plate of delivery. Checks listed below should be taken as a minimum.
(1) If all required documents and accessories are provided as per the packing list.
(2) Check the equipment model.
(3) If the equipment is damaged and all parts are provided.
(4) If refrigerant leaks.
(5) Do not remove the protective cover on the flagon of the shell-and-tube heat exchanger
before connecting the water tube and check if the water pipe is clean.
(6) Check if the installation and operation are within the allowable conditions.
When there is damager or any other question, contact the local sales representative for
applicable solutions.
Note: After the acceptance check, take necessary protection to the unpacked equipment. Note
that it is not recommended to unpack the equipment too early to avoid any unexpected damage.

4.3 Handling and Lifting

Each unit will undergo a series of strict factory inspections and tests to guarantee the expected
performance and quality. However, special attention should be paid during handling and shipping to
prevent the control system and the piping system from being damaged.
It is best to unpack the chiller at the installation location and keep the chiller upward. When the
chiller is unpacked during handing, please follow the lifting instructions stated below.
(1) Move the chiller by placing three levers 1/5 wider than the width of the chiller under the
base and meanwhile always keep the chiller in balance.
(2) See the figure below for more details.
The expander bar
should be longer
than the width of
the unit

4.4 Installation Foundation

(1) Installation foundation shall be designed by the qualified designer in accordance with the
actual condition.
(2) A rubber pad shall be placed under the base of each single unit and then secured on the
ground or the roof. Alternatively, each single unit can be placed side by side on the parallel
channel steel with enough strength which then shall be secured with anchor bolts. Distance
between each single unit shall be keep 1m as a minimal.
Copyright 2018. This translation is property of GREE PRODUCTS SL. All rights reserved. Total or partial reproduction without its express authorization is prohibited.
5
protected by
flexible materia