�.6
Commissioning
!
Commissioning is only to be performed by an autho-
rized service engineer.
i
The installation conditions must be satisfied before
the start of erection work by a service engineer. Fur-
ther information can be found in the planning folder.
!
The specifications given in the planning folder are
minimum requirements designed to ensure correct
installation of the SDL 41x / SDL 42x. Any particu-
lar local legislation, guidelines and standards must
be observed with regard to the specifications.
Robert Bosch GmbH does not accept any liability for
damage arising from non-observance of local regula-
tions.
�.7
Operation
Operation of the SDL 41x / SDL 42x is described in the
operating instructions.
Remaining hazard warning
The possibility of remaining hazards cannot
be excluded.
¶
Observe the safety instructions. Refer to
"User information".
¶
Wear protective clothing and equipment.
Robert Bosch GmbH
Maintenance | S�� ��� � S�� ��� | ��
S�� ��� � S�� ��� | ��
4.
Maintenance
This Section describes the maintenance work which
can be performed by the user.
�.�
Cleaning and servicing
!
Servicing and repair work is only to be performed
by authorized service personnel. Ensure compliance
with the safety precautions for service and main-
tenance as described in the "Safety instructions"
Section.
�.�
Maintenance intervals
Observe the following intervals for maintenance work
and testing.
Component
Cleaning
�.�
Cleaning
!
Do not use high-pressure cleaners.
Component
Notes on cleaning
SDL 41x / SDL 42x To ensure proper operation, brush off or
extract any contamination (e.g. stones)
from the side slip tester.
Water drain
Make sure the water drain is not
obstructed and cannot become clogged.
| ��
en
x
x
|
1 691 636 210
2010-09-17