Boiler Body Assembly; Fitting The Casing - Sime 1R Serie Manual De Instrucciones

Ocultar thumbs Ver también para 1R Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 13
with a static exhaust device that
ensures const ant and ef ficient
extraction of products generated by
combustion;
– to prevent the wind from creating
pressure zones around the chimney
top greater than the uplift force of
combustion gases, the exhaust
outlet should be at least 0.4 m
higher than structures adjacent to
the stack (including the roof top)
within 8 m;
– have a diameter that is not inferior
to that of the boiler union: square or
rectangular-section flues should
have an internal section 10% grea-
ter than that of the boiler union;
– the useful section of the flue must
conform to the following formula:
P
S = K
√H
S resulting section in cm
K reduction coefficient for liquid
fuels:
– 0.045 for firewood
– 0.030 for coal
– 0.024 for light oil
– 0.016 for gas
P boiler input in kcal/h
H height of flue in metres, measu-
red from the flame axis to the
top of the flue reduced by:
– 0.50 m for each change of
direction of the connection
union between boiler and flue;
– 1.00 m for each metre of
union itself.
2.5

BOILER BODY ASSEMBLY

The boiler body comes supplied assem-
bled. Where there is difficulty in gaining
access to the boiler room, the body can
be supplied in separate sections. For
assembly, proceed as follows:
– prepare the sections, cleaning the
seats of the tapered nipples with
solvent;
– insert the bead of putty (fig. 5) in the
groove provided for fume tightness,
pressing lightly;
– prepare one of the two intermediate
sections. After lubricating them with
boiled linseed oil, insert the tapered
nipples (fig. 6);
– prepare the head, proceeding as
above, and bring it up to the inter-
mediate section. Add only one sec-
tion at a time;
– assemble the sections, using the
tools provided consisting of a pair of
staybolts for assembly with the cor-
24
2
r esponding accessor ies (code
6050900 - fig. 7), exerting pressure
simultaneously on the top hub and
on the bottom hub. If, during this ope-
ration, the sections were to slot
together in such a way as not to be
even and parallel, slide a chisel in the
tighter side and, by applying a little
force, bring the two pieces together
so that they are parallel.
The sections can be considered pro-
perly joined together when their
outer edges come into contact;
– insert the bead of putty in the groo-
ve of the section that has just been
assembled, and then proceed to joi-
ning up the other sections until the
body is completed.
NOTE: before proceeding to con-
nect the system, test the boiler
block with a water pressure of 7.5
bar.
2.6

FITTING THE CASING

Fig. 5
The casing and the control panel are
supplied in separate cardboard packa-
ges. The housing package also con-
tains the boiler documents and the
glass wool for insulating the cast iron
body. To fit the casing, proceed as fol-
lows (fig. 8):
– fix the left front side angle bar (2)
and the right front side angle bar (3)
to the upper tie rods using the two
galvanized nuts provided;
– place the front cross bar (4) on the
Fig. 6
lower tie rods before securing the
angle bars with the two cap nuts
provided;
– insulate the cast iron body with the
glass wool (1);
– fix the side parts (5) and (6) to the
angle bars using the ten self-tapping
screws provided, and secure them
at the back with the nuts placed on
the tie rods;
– assemble the lower rear panel (7)
KEY
1 Pin
2 Flange ø 35/87
3 Biconical nipples
4 Staybolt L. 900 + staybolt L. 980
5 Flange ø 50/87
6 Stub
7 Thrust bearing
8 Nut
9 Tightening wrench
Fig. 7

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido