Installation; Boiler Room; Boiler Room Dimensions; Connecting Up System - Sime 1R Serie Manual De Instrucciones

Ocultar thumbs Ver también para 1R Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 13
1.6.3 F.B.R. burners
Boiler
Model
1R4
G1 2001
1R5
G1 2001
1R6
G2 2001
1R7
G2 2001
1R8
G2 2001
1R9
G2 MAXI
1.6.4 Burner assembly
The boiler is supplied to be assembled
on the burner.
The connection flange dimensions are
indicated in fig. 4.
A
B
mm
mm
1R 4÷6
110
150
1R 7÷9
130
170
2R 6-7
130
170
2R 8÷15
160
190
2

INSTALLATION

2. 1

BOILER ROOM

The boiler room should feature all the
characteristics required by standards
governing liquid fuel heating systems.
2.2

BOILER ROOM DIMENSIONS

Position the boiler body on the founda-
tion bed, which should be at least 10
cm high. The body should rest on a
surface allowing shifting, possibly by
means of sheet metal.
Leave a clearance between the boiler
and the wall of at least 0.60 m, and
between the top of the casing and the
ceiling of 1 m (0.50 m in the case of
boilers with incorporated D.H.W. tank).
The ceiling height of the boiler room
should be less than 2.5 m.
2.3

CONNECTING UP SYSTEM

When connecting up the water supply
to the boiler, make sure that the speci-
fications given in fig. 1 are observed.
All connecting unions should be easy
Atomising angle
60°
60°
60°
60°
60°
60°
C
ø
M8
M8
M8
M10
to disconnect by means of tightening
rings. A closed expansion tank system
must be used.
2.3. 1 Filling the water system
Before connecting the boiler, thorou-
ghly flush the system to eliminate
scale which could damage t he
appliance.
Filling must be done slowly so as to allow
any air bubbles to be bled off through the
air valves. In closed-circuit heating
systems, the cold water filling pressure
and the pre-charging pressure of the
expansion vessel should be no less than
or equal to the height of the water head
of the installation (e.g. for water head of
5 metres, the vessel pre-charging pres-
sure and installation filling pressure
should be at least 0.5 bar).
2.3.2 Water system characteristics
THE WATER USED FOR THE CENTRAL
HEATING SYSTEM SHOULD BE TREA-
TED IN THE FOLLOWING CASES:
Boiler
Model
2R6
G2 MAXI
2R7
FG 14 TC
2R8
FG 14 TC
2R9
G 20 TC
2R10
G 20 TC
2R11
G 20 TC
2R12
G 20 TC
2R13
G 20 TC
2R14
G 30/2 TC
2R15
G 30/2 TC
B
– for extensive systems (with high
contents of water);
– frequent addition of water into the
system;
– should it be necessary to empty the
system either partially or totally.
2.4
The flue is of fundamental importance
for the proper operation of the boiler;
if not installed in compliance with the
standards, starting the boiler will be
difficult and there will be a consequent
formation of soot, condensate and
encrustation.
The flue used to expel combustion pro-
ducts into the atmosphere must meet
the following requirements:
– be constructed with waterproof
materials, and resistant to smoke
temperature and condensate;
– be of adequate mechanical resilien-
ce and of low heat conductivity;
– be perfectly sealed to prevent coo-
ling of the flue itself;
– be as vertical as possible; the termi-
nal section of the flue must be fitted
Atomising angle
60°
60°
60°
60°
60°
60°
60°
60°
60° - 45°
60° - 45°
Fig. 4

CONNECTING UP FLUE

23

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido