Quick Start Guide
ASSEMBLY
Sample Pan
Pan Handle
Pan Support
Draft Shield
Tray Pan
MAKING A SIMPLE MEASUREMENT
Use one of the included absorbent glass fiber pads as a sample to become familiar with the instrument and the
various displays.
Ohaus Corporation www.ohaus.com
CONTROLS
Leveling
Indicator
Leveling
Leveling
Feet
Feet
If the display is not visible and the unit is plugged into a power source, press the
On/Off button.
Directly start a measurement.
Open the cover on the Moisture Analyzer.
Clean the pan.
Place the pan handle in the sample chamber. Ensure that the tongue of the pan
handle fits exactly in the slot of the draft shield element.
Place the empty sample pan and glass fiber pan in the pan handle. The sample
pan must lie flat in the pan handle.
Note: It is advisable for you to work with the pan handle at all times. The pan
handle is ergonomic, safe and provides protection against possible burns due to
a hot sample pan.
Close the cover. This sets the Moisture Analyzer to zero automatically.
Open the cover on the Moisture Analyzer.
Wet the glass fiber pan with a 0.5 to 1 gram of water.
Note: Minimum sample size must be greater than 0.5 gram.
Starting the test
Close the cover, the Moisture Analyzer starts the drying and measurement
process automatically.
i
MB90/MB120
Turns On or Off display and fan.
When pressed, sends Print command.
When pressed, either starts or stops the
drying process.
When pressed, performs Tare function.
Leveling indicator
Used to level the Moisture Analyzer.
MB90/120 Moisture Analyzers Quick Start Guide