Installation - Grundfos DPI Instrucciones De Instalación Y Funcionamiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 43

6. Installation

The sensor can be mounted direct on the side of the pump or on a wall by
means of the mounting bracket supplied.
Fig. 3
Connections of the DPI
The DPI cable has four leads:
1
12 - 30 V supply voltage
2
GND (earth lead)
3
Signal lead
Test lead (can be cut off during mounting). This
4
lead must not be connected to voltage supply.
The DPI must be supplied with power via a PELV supply
(EN 60335-1) where GND is connected to protective earthing.
Furthermore, connect the mounting bracket and/or one or
both of the capillary tubes to earth.
10
Brown
Yellow
Green
White

Publicidad

Tabla de contenido
loading

Tabla de contenido