Single-Connect Spanning - Steelcase Answer Boundary Screens Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

®

Single-Connect Spanning

Installation
1.
Place boundary screen on a clean,
scratch resistant surface.
2.
Install two (2) Answer attachment clips
with four (4) flat head wood screws
(provided) per support bracket (2a).
Install large wing bracket with twenty (20)
flat head wood screws (provided) (2b).
3.
Place Answer End-Of-Run (EOR) vertical
junction over Answer attachment clips and
slide up into position.
TIP: If desired, you can add a screw
(provided) to further secure the top of the
boundary screen to the Answer EOR vertical
junction.
4.
Place three (3) washers inside pocket
of Answer EOR vertical junction and install
four (4) 1/4-20 x 1/2" pan head
screws (as shown).
5.
Install two (2) decorative covers as shown.
6.
Install two (2) glides as shown.
7.
Lift spanning boundary screen assembly
up and assemble rest of Answer panel per
assembly direction # 939504607.
NOTE: If this spanning boundary screen has
a return, go to page 6 for that installation
process.
6
LARGE WING
ANSWER EOR
VERTICAL
JUNCTION
1/4-20 x 1/2" PAN HEAD
5
ANSWER
ATTACHMENT CLIP
2a
BRACKET
2b
SCREW
WASHER
4
3
DECORATIVE
COVER
2a
SEE TIP
2a
ANSWER EOR VERTICAL JUNCTION
Page 3 of 39
73085 Rev E

Publicidad

Tabla de contenido
loading

Tabla de contenido