Dual-Connect Spanning - Steelcase Answer Boundary Screens Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

®
Dual-Connect Spanning Installation
1.
Place boundary screen on a clean, scratch resistant surface.
2.
Place Answer End-Of-Run (EOR) vertical junction into pocket
on boundary screen.
3.
Insert toe of lower hook bracket into the appropriate slot (a)
and swing into position (b), lift lower hook
bracket (c) and swing down into pocket on
boundary screen (d). Repeat for opposite side.
4.
Install five (5) flat head wood screws (provided).
Repeat for opposite side.
5.
Insert upper hook bracket into the appropriate
slots (a), push upper hook bracket (b) and swing
down into pocket on boundary screen (c). Repeat for
opposite side.
6.
Install five (5) flat head wood screws (provided).
Repeat for opposite side.
7.
Place rectangular bracket inside pocket of
Answer EOR vertical junction. If four (4) holes are
visible, only install four (4) screws. If all six (6) holes
are visible, install all six (6) flat head wood screws.
8.
Install two (2) decorative covers as shown.
9.
Install two (2) glides as shown.
10.
Lift single-sided boundary screen assembly up
and assemble rest of Answer panel per assembly
direction # 939504607.
11.
See page 12, step 15 for attaching to storage
or worksurface.
*
This application requires additional support from
storage or worksurface.
ANSWER EOR
VERTICAL
JUNCTION
6
ANSWER EOR
VERTICAL JUNCTION
8
LOWER HOOK
BRACKET
c
(LH SHOWN)
a
b
d
3
2
DECORATIVE
COVER
4
b
c
a
5
9
UPPER HOOK
BRACKET
(LH SHOWN)
RECTANGULAR
BRACKET
7
Page 8 of 39
73085 Rev E

Publicidad

Tabla de contenido
loading

Tabla de contenido