Working Field - baltur TBG 55ME Instrucciones

Ocultar thumbs Ver también para TBG 55ME:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 23
E

WORKING FIELD

N
TBG 55 ME
G
L
I
S
H
The working fields are obtained from test boilers corresponding to the standard EN676 and are indicatively for the combination burner-boiler.
For correct working of the burner the size of the combustion chamber must correspond to current regulations; if not the manufacturers must be consulted.
POWER SUPPLY LINE
The gas supply scheme is shown in the diagram below. The gas train is certified in accordance with regulations EN 676 and
is supplied separately from the burner. A manual shut off valve and anti-vibration joint must be installed upstream of
the gas valve, as shown in the diagram.
GENERAL GAS BURNER SYSTEM
Legend
1) Manual shut off valve
2) Anti-vibration joint
3) Gas filter
4) Minimum gas pressure switch
5) Safety valve
6) Pressure regulator
7)
Valves seal control device
TBG 85 ME
TBG 120 ME
Gas train supplied by the manufacturer
TBG 150 ME
TBG 210 ME
8) Working valve
9)
Air adjustment servo motor
1 0) Air adjustment gate
11)
Air pressure switch
12) Combustion head
13)
Gas adjustment throttle
14)
Gas adjustment servo motor
6 / 15
0006081083_200705
N° 0002922491
REV.: 12/07/07
N° 0002910950
REV.: 10/05/06
The job of the installer

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Tbg 85meTbg 120meTbg 150meTbg 210me

Tabla de contenido