12.17
BLACkOUT WITH THE BOILER ON
In the event of a power cut (BLACkOUT) the boiler behaves as follows:
• Blackout below 10": it returns to its operation in progress;
• In the event of a power cut that lasts over 10" with the boiler on or in the start-up stage, when the boiler
is powered again it goes back to the previous operating condition with the following procedure:
1) It cools down activating the smoke extractor at minimum power for 10' and goes onto the next point;
1) It takes the boiler back to the operating condition before the blackout.
During stage 1 the panel displays ON BLACk OUT.
During stage 2 the panel displays Start-up.
If during stage 1 the boiler receives commands from the panel and thus carried out manually by the
user, then the boiler stops executing the blackout recovery status and proceeds to restart or shutdown as
requested by the command.
12.18
BLACkOUT ABOVE 10" WITH BOILER IN SHUTDOWN STAGE
In the event there is a power cut that lasts MORE THAN 10" with the boiler in the shutdown stage, when
the boiler is powered again it restarts in shutdown mode even if the smoke temperature has fallen under
45°C in the meanwhile. This last stage can be skipped by pressing key 1 (esc) (it goes into start-up) and by
pressing it again (it recognises that the boiler is switched off).
13
MAINTENANCE AND CLEANING
Fig. 26 - Example of a clean brazier
ATTENTION!
All the cleaning operations of all parts must be performed with a completely cold
product and the plug disconnected.
The product requires little maintenance if used with certified high quality pellets.
13.1
DAILY OR WEEkLY CLEANING PERFORMED BY THE USER
AQUOS - IDRON
Fig. 27 - Example of a dirty brazier