Barrette VERANDA 34107834 Instrucciones De Instalación página 6

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

7.
Mounting the Cross Braces:
a. On one side of gate, extend the first brace.
b. Extend brace across gate to the uprights, noting
one side will be adjacent to hinge (Fig. 15).
c. Once length is determined, mark brace in center
with pencil line (Fig. 16).
d. Pre-drill though the two provided brace holes
with
at the measured length with provided #8 x
blunt end screws (2) in the center of the brace
(Fig. 17).
e. Attach brace to uprights. Pre-drill one end of
brace with a
aluminum inside of upright, then anchor the
brace to the upright with #8 x ¾" screw. Repeat
for other end of brace (Fig. 18).
f. Flip rail over. Repeat instructions 7a–7e, being
sure to install second brace on opposite side of
gate, and opposite orientation of brace making
an "X" (Fig. 19).
8.
Hang assembled gate to post:
a. Cut two temporary wood blocks 3" tall (not
included), and rest bottom rail of gate on them.
Align gate between the posts (Fig. 19).
b. Secure hinges to posts with 1" Phillips screws
as provided with the hinges.
c. Adjust tension of hinges – See "Hinge Tension
Adjustment" section.
d. Remove the temporary wood blocks.
6
" drill bit. Then, secure brace together
1
8
" drill bit through upright and
1
8
"
3
8
3" Spacer Blocks
Fig. 15
Fig. 16
Fig. 17
Fig. 18
Fig. 19

Publicidad

Tabla de contenido
loading

Tabla de contenido