8. Align the Clip F of Meter Panel
2 to the hole.
Install the Meter Panel 2 to the
Meter Panel Bracket 3 and
headlight assembly by using
the Screw (M6×16mm) 7 and
Screw (M5×13mm) 8.
Tightening torque
Screw
Tightening torque
Screw
9. Install the Meter Cover 1 to the
Meter Panel 2 by using the
Screw (M5×20mm) 9, Washer
0 and Nut A.
NOTE:
•
Tighten the
9
while pushing the
1 to the Meter Panel 2.
•
Check the tightening torque of
each bolt on a regular basis and
tighten as needed.
To clean, rinse meter cover with water to remove grit and soften dirt. Use
Care
a mild non-abrasive liquid soap, plenty of warm water, and a clean flan-
and
Mainte-
nel cloth or soft chamois. Rinse well to remove all soap residue. Pat dry
nance
do not wipe.
7 : 9.0 N·m
(0.92 kgf-m, 6.65 lbf-ft)
8 : 3.0 N·m
(0.31 kgf-m, 2.25 lbf-ft)
Screw (M5×20mm)
Meter Cover
GENUINE SUZUKI ACCESSORIES
Hole
5/5