G-U BKS B-2193 Serie Manual De Instalación página 49

Cerradura con pestillo motorizada para puertas de madera y acero
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

y
y
Once the power supply has been connected, the red LED at the controller lights up.
Make sure that the 6-pin service plug is inserted.
If an emergency power backup system B-54903-23-3-9 is also connected, the device starts
charging. While charging is in progress, the controller beeps rapidly until it is sufficiently charged
(max. 30 s). "R" indicates that the controller is ready.
y
y
Open both door leaves and make sure they cannot be closed accidentally.
y
y
Then trigger a test run via a control pulse at input I2. During this test, the lock moves through all
sensor points once thus testing that the wiring is correct.
When making changes to or replacing individual components (controller B-54900-01-2-8,
ATTENTION
motor-driven shoot-bolt lock B-2193x/B-2393x or connecting cable B 5490 0300/0308), you
must repeat the test run (see point 6.5)!
Fig.5: Power supply
I1:
I2:
24 V DC
Fig.6: Test run
M
M
24 V DC
49

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Bks b-2393 serie

Tabla de contenido