Environmental Protection - BGS technic 1773 Instruction Manual

Juego de prueba y relleno del sistema de refrigeración
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

8. Close the shut-off valve (4) when the pointer is in the yellow zone
(fig. 4).
9. Please prepare new coolant and put the suction
side (10) of the coolant hose (8) into new
coolant bottle.
10. Open the coolant shut-off valve (9). The cooling
system will be filled with the new coolant (fig.5)
now, until the dial gauge shows a value of
ZERO again.
11. Close the coolant shut-off valve (9) again.
12. If the cooling system is not completely filled, repeat the procedure from Step 6.
13. Disconnect all hoses and place the device back into the case.
14. After refilling work, please check if the radiator is fully filled with coolant. If not, please fill the coolant
by yourself until the radiator is full of coolant.

ENVIRONMENTAL PROTECTION

Dispose of this product at the end of its working life environmentally. Recycle unwanted
materials instead of disposing of them as waste. All tools, accessories and packaging
should be sorted, taken to a recycling centre and disposed of in a manner which is
compatible with the environment. Contact your local solid waste authority for recycling
information.
BGS technic KG
Bandwirkerstr. 3
D-42929 Wermelskirchen
Tel.: 02196 720480
Fax.: 02196 7204820
mail@bgs-technic.de
www.bgstechnic.com
© BGS technic KG, Copying and further use not allowed

Publicidad

Tabla de contenido
loading

Tabla de contenido