Waeco AirCon Service Center ASC5100G Instrucciones De Uso página 89

Estacion de mantenimiento de aire acondicionado
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

ASC5100G
8.7.3
Filling process
1. Enter the preferred settings and press ENTER to confirm.
2. If "Filling phase" has been selected, enter the required value, oth-
erwise continue with chapter "Selecting connections" on page 90.
3. Enter the amount of refrigerant oil which was previously drained or
which is required.
4. Press the cursor key .
5. Enter the refrigerant quantity.
6. Press ENTER to confirm all settings.
I
NOTE
 If extraction is taking place in the same process sequence, the quan-
tity of fresh oil is counted as an additional filling quantity, and is
added to the drained oil quantity extracted beforehand. If this value
is set to 0, exactly the quantity of oil which was extracted will be filled
again.
 To add fresh oil, a vacuum process must be performed in the same
process sequence. If no vacuum process has been selected, only
refrigerant can be selected in the filling menu.
EN
All manuals and user guides at all-guides.com
Filling phase?
ENTER-OK STOP-EXIT
PAG oil
UV tracer
Refrigerant
ENTER-OK STOP-EXIT
Yes
No
ml.
0
ml.
0
g.
500
Operation
89

Publicidad

Tabla de contenido
loading

Tabla de contenido