8023329.1C14/28.06.2021 | SICK
Subject to change without notice
If several through-beam photoelectric sensors which are installed next to one another are
to be used, we recommend swapping the sender/receiver arrangement at every second
through-beam photoelectric sensor and ensuring that there is sufficient distance between
the through-beam photoelectric sensors. By doing this, mutual interference can be pre‐
vented [see
figure
1].
Operating reserve
100
10
1
20
40
60
0
(0.79)
(1.57)
(2.36)
Distance in mm (inch)
Figure 3: Operating reserve 50 mm
Operating reserve
100
10
1
0
40
80
120
160
(1.57)
(3.15)
(4.72)
(6.3)
Distance in mm (inch)
Figure 5: Operating reserve 150 mm
Operating reserve
100
10
1
0
200
400
600
(7.87)
(15.75)
(23.62)
Distance in mm (inch)
Figure 7: Operating reserve 500 mm
1
0
20
0
(0.79)
80
(3.15)
Sensing range
Figure 4: Sensing range 50 mm
1
0
0
40
(1.57)
200
(7.87)
Sensing range
Figure 6: Sensing range 150 mm
1
0
0
200
(7.87)
800
(31.5)
Sensing range
Figure 8: Sensing range 500 mm
O P E R A T I N G I N S T R U C T I O N | GSE2 Flat Side
7
COMMISSIONING
40
60
40
60
80
(1.57)
(2.36)
(3.15)
Distance in mm (inch)
Sensing range max.
150
200
80
120
160
200
(3.15)
(4.72)
(6.3)
(7.87)
Distance in mm (inch)
Sensing range max.
500
700
400
600
800
(15.75)
(23.62)
(31.5)
Distance in mm (inch)
Sensing range max.
9
en