www.groupdynamics-laundry.com
sales@groupdynamics.lv
Installation
Drainage connection
The machine is supplied with a drainage hose
attached, which must be connected to a drain.
See the examples below. The height must be
600-900 mm above floor level.
The lower position (600 mm) is always preferable.
Ensure that the drainage hose has no kinks.
600-900mm
The machine can also be connected to the drain
via a spigot connection. In this case the hose
should also be 600-900 mm above the floor. The
internal diameter of the hole should be at least 18
mm.
• Cut the nipple
• Remove burrs from the hole.
See the illustration.
22
At least 18 mm
Electrical installation
The electrical connection must be made using a
cable for permanent installation, with a multipolar
circuit breaker, by a qualified professional.
Connection on delivery
The machine is supplied as 3-Phase, 400V, 50Hz,
heat output 3000W and has a 10A plug. Any
residual current devices must be type A.
Note!
Repairs and maintenance relating to safety or
performance must be carried out by a qualified
professional.
Coin operation
The machine is prepared for coin operation. Such
installation must be carried out by a qualified
professional.
The installation requires a connection cable to
power the coin meter. This connection cable can
be ordered as an accessory using the factory art.
no. 92 090 95.
The coin meter must be able to short circuit two
signal lines for periods of up to 10 minutes. This
is to give the user time to load the machine,
choose a programme and start the programme
after inserting the coins.
"Insert coin" appears on the display when the
machine is started with the main power switch.