Connect the plug con-
nection between the
intermediate cable and
the bow thruster.
Fit the control panel
and connect this as
shown in the section
Electrical installation in
the manual for the bow
thruster.
Check carefully that the bow thruster
can be allowed to turn before closing the
housing!
Test the operation of the bow thruster.
If test running shows that the thrust direction of the bow thruster
is not the same as that shown by the direction switch on the
control panel the blue (no.1) and the white (no.4) wires on the
relay must be changed round.
Warning
Do not test the bow thruster while the ship is out of the
water unless you have checked carefully that everyone is
at a safe distance from the propeller tunnel. Never allow
the bow thruster to run for more than 5 seconds while the
ship is out of the water.
Installatieinstructies Boegschroeven 'Ignition Protected'
Fitting //
Fit the top part of the
housing.
Position the packing
supplied between the
contact surfaces of
the two halves of the
housing. Make sure
that the packing is
positioned properly.
Tighten up the bolts
using
a
turning
moment of 5 Nm.
If the motor is positioned vertically:
Place the rubber blind nut in the hole, screw the bolt with the
nut on it in the blind nut and tighten this up sufficiently so that
the hole is sealed.
If the motor is positioned horizontally
If the motor is positioned horizontally support is absolutely
essential.
- Place the rubber blind nut in the hole.
- Screw the bolt with the nut on it in the blind nut and tighten
this up until it touches the electric motor.
- Tighten the nut up against the blind nut.
- Hold the nut so that it cannot turn and then screw the bolt
tighter in order to seal the hole.
- Fit a support under the bolt.
ENGLISH
5
020559.01