Horizontal Discharge Installation - Broan Elite E60000 Serie Instrucciones De Instalación

Ocultar thumbs Ver también para E60000 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

8. HORIZONTAL DISCHARGE INSTALLATION (

All internal blower hoods are factory shipped with the blowers mounted for a vertical discharge configuration. For a horizontal
discharge configuration, disassemble the blower(s) from the inner top of the hood and mount it (them) to the inner back panel
of the hood. The procedure below applies for one or two blowers.
Using a 5/16" socket, remove all
blower mounting screws from the
inner top of the hood. Keep the
screws for further use.
Slide the blower to disengage its flange from the
retaining bracket.
Rotate the blower and engage its
flange in the back wall retaining
bracket.
Using a 5/16" socket and the
screws previously removed, secure
the blower to the hood.
All manuals and user guides at all-guides.com
L
S
M
EFT
IDE
S
L
CREW
OCATION
HD0269
HD0270
M
HD0288
- 9 -
INTERNAL BLOWER(S) HOOD ONLY)
OUNTING
HD0282
R
S
IGHT
IDE
S
OUNTING
CREW
L
OCATION
HD0289
R
S
IGHT
IDE
M
S
OUNTING
CREW
L
OCATION
L
S
M
EFT
IDE
OUNTING
S
L
CREW
OCATION

Publicidad

Tabla de contenido
loading

Tabla de contenido