Before Initial Operation; Charge Battery; Setting The Torque; Maintenance - Cleco CellClutch CLBAW083 Serie Manual Del Usuario

Ocultar thumbs Ver también para CellClutch CLBAW083 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 28
Status light
Work light
Until the end
Until the end
of the event
of the event
Until the end
of the event
Until the end
Until the end
of the event
of the event
Until the end
Until the end
of the event
of the event
Legend
Symbol
Meaning
Green LED lights up
Blue LED lights up
Red LED lights up
Buzzer sound is heard
Break
6

Before Initial Operation

Charge Battery

Battery pack is supplied partly charged and must be
charged completely being used for the first time.
► See Original Instructions of Milwaukee charger.
► Do not use any other battery packs / chargers than
the following:
Battery pack 18 V
Order no.
Capacity
T50-1000497
2,0 Ah
T50-1000498
5,0 Ah
Charger 18 V
Order no.
Country
T50-1000499
North America
T50-1000506
Europe
T50-1000507
Brazil
T50-1000543
Argentina
T50-1000544
United Kingdom
T50-1000545
China
3
Use of 80 % of maximum torque
Apex Tool Group
Sound
Meaning
Tool overheat-
ing

Maintenance

alarm
Battery low sta-
tus
General error
1-Bay
P2547BA | 2021-08
Order no.
Country
T50-1000546
Japan
T50-1000500
North America
T50-1000508
Europe
T50-1000547
United Kingdom

Setting the torque

Caution
Winding hazard
Unintentional start-up can cause the output
to start up and cause serious finger injuries.
► Disconnect the tool from the power sup-
ply when converting work.
► Using the clutch adjustment tool provided:
turn clockwise for maximum torque.
turn counterclockwise for minimum torque.
Fig. 1-2: Setting the torque
Recommendation: For best results, start from
minimum torque and adjust in the maximum di-
rection until desired torque is achieved.
7
Maintenance
Note
Loss of warranty
Repairs are only permitted by Apex Tool
Group authorized personnel. If the tool is
opened, the warranty is voided.
► If repair is required send the complete
tool to Sales & Service Center!
Maintenance
Measures
after every ...
cycles
3
Daily
► Check all connections.
► Visual inspection for general dam-
age.
► Perform a general function test
and watch out for excessive vibra-
tion or unusual noise.
250,000
► Send the tool to a certified Sales &
Service Center for assessment.
1
1
EN
EN
6-Bay
15

Publicidad

Tabla de contenido
loading

Tabla de contenido