Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 34
The cell must be installed with the barrel unions underneath and the cell should be horizontal.
50mm fittings have been provided. Make sure that the o'rings are correctly fitted and the
unions are done up tightly.
WARNING: It is essential that pipe work and equipment do not allow gases generated from
the cell to collect and build up.
Once the cell is located, connect the black multi-core cable to the cell. The blue wire must be
connected to the blue terminal. The cable is designed to come from below the cell. Make sure
wing nuts are correctly tightened to ensure good contact.

3.0 Pool Preparation

The chlorinator requires at least 3000ppm of salt but we suggest you prepare the pool at
4000ppm therefore add 4kg's of salt for every 1000 litres of water (a typical pool of around
50,000 litres requires 200kg of salt).
Salt should always be added at the shallow end of the pool and allowed to dissolve. Running
the pump will mix the water and speed the dissolving process.
WARNING: Never add salt to the skimmer box!!
NOTE : Plug the pump directly into a power outlet (bypass the Chlorinator) and run for 8-10
hours to ensure the salt is dissolved prior to running the chlorinator.
When the salt is dissolved, connect the pump to the chlorinator and run it on maximum chlorine
output. Check that the low salt light is not on. If it is, check again in 24 hours.
APR Salt Chlorinator (V3)
Page 4

Publicidad

Tabla de contenido
loading

Tabla de contenido