5 Servicing

This equipment should be maintained and regularly serviced as detailed in the service schedule below. Only personnel that have been trained
and approved by Parker should perform maintenance procedures.

5.1 Cleaning

Clean the equipment with a damp cloth only and avoid excessive moisture around any electrical sockets. If required you may use a mild
detergent, however do not use abrasives or solvents as they may damage the warning labels on the equipment.

5.2 Service Schedule

The service operations should be performed at the hours run or fixed time intervals specified (whichever occurs first).
Component
Generator
Generator
Generator
Generator
Generator
Generator
Generator
Generator
Generator
Generator
Generator
Generator
Check
servicereminder.com
Servicereminder.com is a web based reminder service developed to track when service work is due to be carried out. This ensures that parts can be ordered in
advance and that the service is carried out at the optimum time in accordance with the manufacturers recommendations. This service is free to use, simply log on to
www.servicereminder.com
and select New User Registration.
16
Check that the Power On indicator is illuminated.
Check that air is flowing from the under the generator.
Check the exhaust valve is discharging on a regular basis.
Check for leaks in the system piping
Check the pressure gauges during operation
Check that there is ventilation clearance around the generator.
Check that the fans are operational
Check the condition of electrical supply cables and conduits.
Recommended Service A
Filter Overhaul
Recommended Service B
Valve Overhaul
Recommended Service C
Compressor Overhaul (Compressor units only)
Recommended Service D
Fan Overhaul
Operation
Essential Procedure