Chapter 6. Machine Adjustment And Setting Up; Direction Of Rotation Check (For Mod. Rp85 Only); Adjustment; Control Panel - Minipack-Torre RP40 Instrucciones Para La Instalación, Uso Y Mantenimento

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 55

Chapter 6. Machine adjustment and setting up

6.1. Direction of rotation check (for mod. RP85 only)

Before starting the machine operation check the right direction of rotation following these
instructions:
Rotate the main switch (1) on 1-position.
Lower down the upper hood and execute a work cycle by making sure that the direction of
rotation of the fans will correspond to figure.
If it rotates in the opposite direction to this, it is necessary to shutdown the machine, remove
the power supply plug and invert two of the three-phases of the plug.
Note: The control of direction of rotation should be carried out each time you change
the electrical plug.

6.2. Adjustment

6.2.1. Control panel

The machine is fitted with a control panel, from which all programming and operation functions can be set.
1 Main switch
2 Button "DECREASE". Reduces set function values
3 Button "INCREASE". Increases set function values
A Temperature warning light
B Shrinking warning light
C Sealing warning light
P Cycle counter selection button
D Display. Displays selected functions and relative
settings
S Programme and variable selection button

6.2.2. Switching the machine on

Turn the main switch (1) into pos. 1.
The display (D) turns on and the number of the currently selected program will appear.
Switching the machine on (with programs P02÷P10) powers the shrinking heat element which begins to heat up.
Before using the machine, wait until the adjusting temperature is reached. This is signalled by the extinction of the
warning light (A).

6.2.3. Program selection and variable setting

The machine is equipped with 10 selectionable programs (P01÷P10).
Push buttons (2) and (3) to select the number of the program.
Program P01
This program is for film sealing only.
The film melts due to the heat of the sealing blade. The pressure between the sealing blade
and the upper contrast lined in Teflon separates the 2 edges of the film.
The product to be packed is enclosed in a slack bag.
Program P02÷P10
This program seals and shrinks film simultaneously.
Shrinking is produced by the forced circulation of hot air around the the package. Air is heated
by passing through a heat element (heat diaphragm).
The product to be packed is enclosed in a bag which perfectly adheres to its shape.
The number of settable variables will depend upon the programme number (see the following table).
The programmes P02÷P10 must be programmed in the following order (only the sealing time can be set up for
programme 01):
1.
Sealing time
2.
Fan delay time after sealing
3.
Shrinking time
4.
Heat chamber temperature
All manuals and user guides at all-guides.com
19
EN

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Rp55Rp85

Tabla de contenido